What to Confirm Before Ordering SF6 Gas Equipment

SF6 gas handling cart connected to GIS equipment at a substation, with technicians performing on-site service and a technical checklist cover title.

Start with the application requirements, not the equipment specifications.

Before purchase, confirm the gas volume, recovery target, storage method, switchgear connection, power supply, and applicable standards. These requirements determine the compressor, vacuum pump, storage tank, hoses, couplings, and control system you need.

1. Define the Application

First, define the required functions.

Typical functions include:

  • SF6 recovery;
  • gas-compartment evacuation;
  • SF6 refilling;
  • gas transfer;
  • temporary gas storage;
  • filtration or gas conditioning.

Different applications require different types of SF6 gas equipment.

SF6 Gas Handling Carts

An SF6 gas handling cart may include:

  • oil-free compressor;
  • vacuum pump;
  • filtration system;
  • storage tank;
  • hoses and couplings;
  • weighing system;
  • manual or PLC control.

Typical compressor capacities range from about 4 to 38 m³/h. Vacuum pump capacities may range from about 17 to 64 m³/h.

Select the capacity based on gas volume and the required service time.

SF6 Refilling Devices

Portable SF6 refilling devices are mainly used to transfer gas from cylinders into gas compartments.

Typical components include:

  • pressure regulator;
  • filling hose;
  • pressure gauge;
  • cylinder connection;
  • self-sealing coupling.

For these devices, connection compatibility and pressure control usually matter more than high flow rate.

SF6 Storage Tanks

Common storage sizes include:

Tank Volume Typical SF6 Filling Design Pressure
300 L Approx. 280 kg 50 bar
600 L Approx. 580 kg 50 bar
1,000 L Approx. 980 kg 50 bar

Select the tank based on the required gas capacity, operating pressure, and applicable pressure-vessel requirements.

2. Confirm Applicable Standards

Specify the applicable standards and editions in the purchase documents.

Common references include:

Standard Main Application
IEC 60376 Technical-grade SF6 for electrical equipment
IEC 60480 Re-use specifications for SF6 and its mixtures
IEC 62271-4 Handling procedures for insulating gases
GB/T 12022 Industrial sulfur hexafluoride
DL/T 662 SF6 filling and recovery equipment

Do not apply technical-grade gas limits to recovered SF6.

The supplied reference lists IEC 60376 values for technical-grade SF6 including:

  • SF6 ≥ 99.7% by volume;
  • air < 2,000 µL/L;
  • CF4 < 800 µL/L;
  • H2O < 200 µL/L.

For SF6 intended for re-use, the supplied IEC 60480:2019 reference includes:

  • SF6 > 97% by volume;
  • air/CF4 < 30,000 µL/L;
  • H2O < 200 µL/L;
  • mineral oil < 10 mg/kg;
  • total acidity < 50 µL/L.

Clearly state the gas category, applicable standard, and acceptance limits in the purchase specification.

3. Check Compressor Performance

SF6 gas equipment used for recovery should use an oil-free compressor to help prevent oil contamination.

Confirm:

  • compressor type;
  • displacement;
  • maximum working pressure;
  • inlet and outlet pressure range;
  • cooling method;
  • protection functions.

Compressor displacement alone does not determine recovery speed.

Actual performance is also affected by:

  • compartment pressure;
  • hose diameter and length;
  • valve and coupling resistance;
  • filter resistance;
  • storage pressure;
  • gas temperature.

Ask the supplier to state the recovery rate and the test conditions used to verify it.

4. Confirm Vacuum and Recovery Performance

Evacuation and gas recovery are different operations.

The vacuum pump removes air and moisture before filling. The recovery circuit removes SF6 from the gas compartment and transfers it to storage.

Confirm:

  • vacuum pump capacity;
  • achievable evacuation pressure;
  • recovery end pressure.

Typical vacuum pump capacities in the supplied references range from about 17 to 64 m³/h.

High-performance recovery systems may specify a recovery end pressure below 1 mbar.

Do not confuse vacuum pump ultimate pressure with SF6 recovery end pressure.

5. Check Filtration and Gas Quality

Typical SF6 filtration systems may reduce:

  • moisture;
  • particles;
  • selected decomposition products.

Molecular sieve filtration is commonly used to remove moisture and contaminants.

However, filtration does not automatically mean that recovered gas meets a technical-grade gas specification.

Analyze the recovered SF6 after filtration or reclaiming.

IEC 60480 uses a decision process based on gas condition, contamination, treatment, storage, and final analysis.

Specify the filtration capability and gas-quality acceptance criteria separately.

6. Confirm Storage Capacity

Before selecting a storage tank, determine the maximum amount of SF6 that may be recovered during a single job.

Check:

  • tank volume;
  • maximum filling mass;
  • design pressure;
  • safety valve;
  • pressure gauge;
  • liquid or gaseous storage capability;
  • weighing system;
  • pressure-vessel certification.

Some systems provide digital weighing with an accuracy of about ±0.4 kg.

Confirm the actual weighing range and accuracy with the supplier.

7. Check Couplings, Hoses, and Adapters

Confirm connection compatibility before placing the order.

Common connection sizes may include:

  • DN6;
  • DN7;
  • DN8;
  • DN12;
  • DN20.

The exact connection depends on the installed switchgear.

Self-Sealing Couplings

SF6 self-sealing couplings help reduce gas release during connection and disconnection.

They also reduce air ingress and improve gas tightness.

To minimize SF6 emissions, confirm that the equipment and hoses use gas-tight, self-sealing couplings.

Hose Size

Typical configurations may include:

  • DN19 recovery hose, about 10 m;
  • DN13 filling hose, about 5 m.

Long or undersized hoses increase flow resistance and can reduce recovery speed.

8. Confirm Emission-Control and Safety Features

SF6 gas equipment should be designed to minimize gas release during recovery, transfer, connection, and disconnection.

Key features include:

  • gas-tight piping;
  • self-sealing couplings;
  • low-leakage valves;
  • controlled gas recovery;
  • low recovery end pressure.

Some manufacturers specify an annual leakage rate of ≤1%. If this is required, ask for the test method and conditions.

Safety features may include:

  • overpressure protection;
  • pressure switches;
  • non-return valves;
  • storage tank safety valve;
  • emergency stop;
  • phase-sequence protection;
  • automatic shutdown.

For indoor work, ensure adequate ventilation and follow site procedures for handling SF6 and possible decomposition products.

9. Confirm Power Supply and Site Conditions

Check the electrical supply before ordering SF6 gas equipment.

A common configuration is:

  • three-phase;
  • five-wire;
  • AC 380 V ±10%;
  • 50 Hz.

Other voltages and frequencies are also common, depending on the market.

Confirm:

  • site voltage;
  • frequency;
  • phase configuration;
  • available electrical capacity.

Also check the required operating environment.

A typical specification may state:

  • temperature: −10°C to +40°C;
  • relative humidity: below 85%, without condensation.

Select the equipment based on the actual site conditions.

10. Select the Right Control Level

SF6 gas equipment may use:

  • manual control;
  • PLC control;
  • touch-screen control;
  • remote monitoring.

Automation can control recovery, evacuation, gas transfer, alarms, and pressure monitoring.

Choose the control level based on operating frequency, process complexity, and operator needs.

11. Confirm Mobility

For substations or sites with limited access, check:

  • equipment dimensions;
  • total weight;
  • wheel design;
  • lifting points;
  • modular construction;
  • forklift access;
  • vehicle loading.

A modular SF6 recovery device can be useful where a complete unit cannot reach the gas compartment.

12. Check Documentation and Support

Before ordering SF6 gas equipment, confirm that the supplier can provide the required technical documents.

These may include:

  • operating manual;
  • maintenance instructions;
  • electrical drawings;
  • piping diagrams;
  • spare-parts list;
  • equipment certificates;
  • pressure-vessel documents;
  • calibration certificates where applicable.

Also confirm:

  • warranty period;
  • spare-part availability;
  • filter replacement requirements;
  • technical support;
  • operator training.

Pre-Order Checklist for SF6 Gas Equipment

Item What to Confirm
Application Equipment type and gas volume
Standards Applicable IEC and local standards
Compressor Oil-free type and required capacity
Vacuum Pump capacity and final evacuation pressure
Recovery Required recovery end pressure
Filtration Moisture, particle, and contaminant removal
Gas quality Test method and acceptance limits
Storage Tank size, pressure rating, and filling mass
Couplings Compatibility with existing switchgear
Hoses Correct diameter, length, and connection type
Emission control Self-sealing couplings and low leakage
Safety Overpressure protection and emergency stop
Power Voltage, frequency, and phase
Controls Manual, PLC, touch screen, or remote
Mobility Size, weight, and transport method
Documentation Manuals, certificates, and drawings
Support Warranty, training, and spare parts

Confirm the Requirements Before Ordering

Before ordering SF6 gas equipment, confirm the operating conditions that directly affect equipment selection: gas quantity, recovery pressure, evacuation target, storage capacity, connection type, power supply, applicable standards, and site conditions.

These requirements determine the appropriate compressor capacity, vacuum performance, storage configuration, hoses, couplings, controls, and safety features.

A clear technical specification also makes it easier to compare suppliers on the same basis and reduces the risk of selecting equipment that does not match the application.

If you are selecting SF6 gas equipment for a GIS, circuit breaker, substation, or maintenance project, send us your gas volume, equipment type, required recovery pressure, power supply, and connection details through [email protected]. Our technical team can help review the application and recommend a suitable configuration.

Leave a Reply